Project 2

I feel i've learnt ALOT... and it's specifically in CAPS... it's really the experience that i was being put through without choice, we had to swallow our differences and just tolerate. this is a very tough project, thought it would be fun but it turned out tiring, there's alot of things to mention, but basically this project put me through bad times which i feel can bring me out to the working world. what so bad about this project is that it's a major project and the final product is for our portfolio what a good opportunity to put something nice in my portfolio but it wasn't how i expected it to be... group members were chosen for us and there's no unity in groups we had to pull it through even if we don't like the people... but all in all my group pulled through and i'm glad all of us tried to put in our effort. maybe sometime we'll work together again when that happens we already know each other's working style and it is easier to adapt by then.
thanks guys

Extra Production

this day is cause by bad weather from the 6th production day. if not we're ready to edit and finish up the whole project sooner. weather played a huge part in ruining our shoot. FINALLY you're done with our shoot, today's sun was blazing i liked it but my casts, they were complaining. after the last scene we went down to the VSC room to do a photoshoot, we snuck in of course. anyway, yup after the photoshoot, we wrapped up and thank our cast, we'll treat them to a good meal after the whole thing maybe during holidays

Sixth Production

Today we did many scenes. we were almost done with our whole production but suddenly the place was drenched like how huang he flood China.. haha but it was really funny, we had to run back in as the rain got to heavy, took umbrella to shelter the camera. as the ained stopped we went out again. not long later, less than 3 mins i would say we had to run back in again. what a day, maybe we didn't pray before we had our shoot. that's why... heard in hongkong they pray before production. the day was ruined by the rain. i had the alumni night to help out thus i left my group members to keep the equipments while i rush for the alumni night.

Fifth Production

our fifth production had to shoot our forth production day if you know what i mean. so we shot our yesterday scene and we went well, finished the whole scene in 1 day. we were so tempted to destroy a person's car, a lecturer in culinary school. the day before as we were down there waiting for one last cast, we didn't know we were not supposed to use the toilets there as it didn't say NO DESIGN STUDENTS ALLOWED whatsoever. so we went in and used the toilets but we were told off by her and scolded like hell....she wanted to ask me to go out and call all my groupmates in just to scold us and tell us off, but i handled situations. luckily we didn't bump into him today.

Forth Production

Oh no, one of our bullies overslept and totally missed our shoot, due to too many cast, we had to call it a day and by the time the bully whom overslept and can rush down another bully had to leave thus, our shoot had to be cancelled. it was a sunny day and shooting was perfect. but it was ruined. 

Third Production

Due to cast unable to come, our shooting schedule had to change.
in the end we met up in school to plan for our shoot so as to save more time and make our shoot smoother. 
we really has a trashed out session in the end. GOOD DAY, we planned out the whole other shoots to come.

Second Production

Due to not usable rushes, we had to retake the whole Canteen scene and the intro scene. what a wasted first production day.

another set back was that the casts had to leave by 5. they can only come at 2.30, finish their lunch it would be 3pm and by then after finish rehearsing, it's almost 3.30, 4pm so effectively we only had 1plus hours to shoot. it was a good shoot since we're done with the canteen scene, one scene lesser to do!